Thursday, April 4, 2013

It's been a while. But here's our update so far.

It's been a while since we had last posted. Had so many things happen in the past months. Getting married, honeymooning. Helping others..

We have come along way since our last 2012 update.

We will have the pictures tell the story. Bring on 2013

Enjoy.

Brickwork to the rear ground level alfresco


Brickwork to theatre


Brickwork complete, cladding to first level installed. Scaffold removed.


The inside, insulation installed as well as our beautiful cavity slide door separating the main entrance hallway to the kitchen/family room.


Insulation to the theatre wall to side of house


Insulation to our kitchen wall and window surround. 


Front study/lounge room window. We love it


We now have a front door


View from our front door hole


Hooray Gyprock completed

Kitchen/Family room



Kitchen fit out completed

Island without caesar stone 


Island with caesar stone


Kitchen...


Vanity for main bathroom


Vanity in ensuite


Our stairs


Balcony prepared using spotted gum wood.



How the house is to date.

There is a lot of dampness going through our front render due to the drainage pipes not connecting to the drain outlet. Therefore when wet, water running from the gutters are dropping onto the soil and condensation occurs into the render. Hope this get sorted out soon as its very ugly and may hinder the render and brick work for the future. RH said they will sort this out.